Client

North Qld Bulk Ports

Time

Nov 2016

Download Case Study
Back to List

Scope of Work

Installation of 2 x cyclone moorings for NQBP suitable for tugs located at Abbot Point. The admiralty style moorings consisted of 3 x 3T stevshark anchors and 76mm chain. PMG was responsible for the design, installation and certification.

Back to List