Client

Goodline

Time

Jan - Aug 2016

Contract Value

7M

Download Case Study
Back to List

Scope of Work

  • Transport to Weipa 50 000T of rock / pavements / pipes / equipment. This was achieved with 4 x tug and barge sets, running from PMG’s Townsville Marine Facility.
  • Provision of temporary berthing facilities (spudded barge dock) on site to allow barge unloading to be achieved on a greenfield river bank.
  • Provision of cyclone moorings.
  • Driving of 50 steel tubular piles to support the river facilities construction. 750mm diameter to 1050mm diameter, 25 – 40m long, vertical and raking piles.
  • Complex piling requirements including extremely accurate tolerances, detailed QA requirements, electronic iPiler reporting and energy monitoring throughout each drive, full PDA testing requirements.