Client

Van Oord

Time

2010

Contract Value

$350K

Download Case Study
Back to List

Scope of Work

Installation of 5 x cyclone moorings for Van Oord tugs, barges and dredges located at Hay Point. The moorings were traditional Admiralty style 3 x anchors (3 and 5T Stingrays)/70mm chain leg moorings. The moorings were installed under supervision by the mooring designers (Jeyco), using Black Panther and PMG120 / 70T crawler crane.