Client

Svitzer Bowen / AMOG

Time

2012

Contract Value

300K

Download Case Study
Back to List

Scope of Work

Installation of 2 x cyclone moorings for Svitzer tugs located at Bowen. The moorings were traditional Admiralty style 3 x anchors (3T Stingrays)/70mm chain leg moorings. The moorings were installed under supervision by the mooring designers (AMOG), using PMG Pride and our Sheerlegs crane barge.

Back to List