Client

Hamilton Island Enterprises

Time

2009


Back to List

Scope of Work

Pipeline installation and underwater construction activities associated with installation of Hamilton Island to Dent Island water pipeline including:

  • Tow out, position and S Bend sink preassembled 3 x linked HPDE pipelines on Hamilton Island.

  • Mobilise tug + barge barge from Townsville to Hamilton Island for block install.

  • Survey trench at Dent and Hamilton Island.

  • Seabed survey along pipeline route, prior to pipeline installation.

  • Install 150 concrete ballast blocks onto sunken pipeline.

  • Final inspection of installed pipeline and concrete ballast blocks by diver.

Back to List