Client

Pacific King Shipping

Time

2006

Download Case Study
Back to List

Scope of Work

In-water repair of damaged bulbous bow to vessel Fu Xing 1 – make ship safe for passage to shipyard.

Description of Works:
  • Mobilise Tug (AR Ford) + barge (D10) + 12 man crew including 6 man dive team from Townsville – Solomon Islands.
  • On-site fabrication of repair plates and underwater install by wet welding.
  • Perform internal repairs / cement box repairs to make vessel safe for voyage to permanent repair shipyard.
Back to List